FORM NL-26 - CLAIMS INFORMATION - KG Table I
Insurer : General Insurance Corporation of India
Solvency for the period ended 30th September 2011
Required solvency margin based on net premium and net incurred claims - - (Rs in Lacs)
Item No. Description PREMIUM  CLAIM RSM-1 RSM-2 RSM
Gross  Premium Net  Premium Gross incurred claim Net incurred Claim
1 Fire 3526 86.52 2924 36.93 3811 27.00 3572 73.40 584 87.39 1071 82.02 1071 82.02
2 Marine Cargo 453 02.68 425 03.35 312 80.31 312 37.71 85 00.67 93 71.31 93 71.31
3 Marine Hull 715 53.44 606 08.81 457 66.68 392 84.56 121 21.76 117 85.37 121 21.76
4 Motor 2579 92.39 2579 92.39 2282 91.67 2282 91.67 515 98.48 684 87.50 684 87.50
5 Engineering 826 43.32 712 58.35 357 36.84 323 45.24 142 51.67 97 03.57 142 51.67
6 Aviation 671 96.26 433 49.47 540 41.10 478 92.15 86 69.89 143 67.64 143 67.64
7 Liabilities - - - - - - -
8 Others 3495 85.85 3406 29.42 2496 71.42 2497 98.51 681 25.88 749 39.55 749 39.55
9 Health  - - - - - - -
10 Life 30 76.49 30 53.61 9 57.84 9 54.97 6 10.72 2 86.49 6 10.72
- Total 12300 36.96 11118 32.32 10268 72.86 9870 78.20 2223 66.46 2961 23.46 3013 32.18
- RSM1 premium has been calculated based on 12 month figure  i.e. from 01.10.2010 to 30.09.2011 on rolling basis complying with circular no.  IRDA/F&I/CIR/F&A/076/05/2010 dated 10.05.2010.
RSM2 Gross Incurred Claim and Net Incurred Claim has been calculated complying with circular no. 045/IRDA/F&A/Mar-06 dated 31.03.2006 and the same for the period 01.04.11 to 30.06.11 has been multiplied by 4  for arriving at annual figure.
- - - - - - - - -
- - - - - - - -
Solvency for the period ended 30th September 2010
Required solvency margin based on net premium and net incurred claims - - (` in Lacs)
Item No. Description PREMIUM  CLAIM RSM-1 RSM-2 RSM
Gross  Premium Net  Premium Gross incurred claim Net incurred Claim
1 Fire 3375 81.58 2781 90.76 1847 09.59 1899 18.18 556 38.15 569 75.45 569 75.45
2 Marine Cargo 364 94.67 330 23.58 286 29.70 222 12.32 66 04.72 66 63.70 66 63.70
3 Marine Hull 596 67.14 495 30.65 779 82.32 459 96.68 99 06.13 137 99.00 137 99.00
4 Motor 2159 11.25 2159 10.87 2016 89.26 2016 89.26 431 82.17 605 06.78 605 06.78
5 Engineering 758 69.66 660 67.93 365 83.20 302 31.17 132 13.59 90 69.35 132 13.59
6 Aviation 697 77.75 576 04.92 588 23.01 466 99.38 115 20.98 140 09.81 140 09.81
7 Liabilities                  -                    -                    -                    -                    -                    -                    -  
8 Others 2748 99.00 2678 29.55 2136 21.43 2145 14.21 535 65.91 643 54.26 643 54.26
9 Health                   -                    -                    -                    -                    -                    -                    -  
10 Life 16 45.33 16 45.33 8 45.23 8 45.23 3 29.07 2 53.57 3 29.07
- Total 10718 46.38 9698 03.59 8028 83.74 7521 06.43 1939 60.72 2256 31.92 2298 51.66
- RSM1 premium has been calculated based on 12 month figure  i.e. from 01.10.09 to 30.09.10 on rolling basis complying with circular no.  IRDA/F&I/CIR/F&A/076/05/2010 dated 10.05.2010.
- RSM2 Gross Incurred Claim and Net Incurred Claim has been calculated complying with circular no. 045/IRDA/F&A/Mar-06 dated 31.03.2006 and the same for the period 01.04.10 to 30.09.10 has been multiplied by 2 for arriving at annual figure.
- - - - - - - - -
- Note: - - - - - - -
- 1. Claim and Premium is not provided separately for Liabilities and Health Insurance as it is considered as part of Others under Miscellaneous. 
- 2. Claim and Premium for Life Insurance has been separately disclosed under item 10. - -
- - - - - - - - -